Rail Yard Counts

9 November 2026

What is a switch list, and how does it differ from a weekly car count?

Rows of freight cars parked on multiple siding tracks in a rail yard at dusk.

A switch list is the document a yardmaster or switch crew works from to move cars: which car goes on which track, in what order, to build a block for the next outbound. It comes from waybill data, a crew's radio call, or a walk down the ladder with a notepad. It describes one planned move, built fresh for that shift, and it's only as current as the last update someone entered.

A weekly satellite car count is a different animal. It doesn't tell anyone where to spot a car or which cut to pull next. It reads the yard footprint from above on a fixed schedule and reports what's sitting where: rolling stock by type, siding by siding, as of the pass date. Nobody radios it in. Nobody has to walk the ladder to generate it.

Where ground truth comes from

Ground-truthed inventory, in the way most yards mean it, is a record built from someone or something physically confirming a car's location. A switch list qualifies when the crew that built it actually walked or worked the track. A TOPS extract qualifies if the data entry matches what's on the ground, which isn't guaranteed the moment interchange traffic shows up unannounced or a car gets bad-ordered mid-shift. The paper trail and the physical yard drift apart more than most car count discussions admit, especially at outlying yards with no full-time clerk.

A satellite count is ground-truthed in a narrower, more mechanical sense. The imagery shows what was physically on the siding at the moment of capture: a hopper on track 4, a count of gondolas on track 7. Reporting marks, load status, and consignment details sit outside what a photograph can tell you. That's a real limit, worth stating plainly rather than talking around.

Why a yard would want both

Switch lists are built for moves that are happening now, today, this shift. They're built car-by-car, for one shift, and go stale the moment the next cut gets pulled. A weekly satellite count answers a slower question: is siding use at this yard running where it normally does, is a track that should be empty sitting full, has a count of flatcars sat on the same track for three weeks running. That's a utilization question, and answering it doesn't call for anyone to pull a switch list.

Where the two genuinely overlap is reconciliation. A yard with no ground-truthed inventory system, or one where the switch list record and the physical yard have quietly diverged, has no independent check on either. A repeat weekly read of the same footprint gives operations a second source, separate from crew paperwork, that either confirms the siding picture or flags where it doesn't. If a track the records show clear has had six cars sitting on it for a month, that's worth a phone call before it shows up as a surprise during a storage billing dispute or a capacity planning meeting.

What a satellite count can't do

A satellite count reads from imagery at a fixed cadence and a fixed resolution. A car that moves onto a siding and off again between passes won't show up in that week's read, and building a train still calls for a switch list: reporting marks, car numbers, and commodity detail come from paperwork; a photograph can't carry that information. That's a utilization and occupancy picture. Treating it as a car-tracking system would be the wrong use of it.

For a yard or a network running siding counts off memory, a weekly phone call to the local agent, or a switch list record nobody's had time to reconcile against a walk-down in months, a weekly imagery read of the whole footprint fills a different gap than the switch list does: it gives a standing, repeatable occupancy picture, siding by siding, without anyone having to generate it by hand. Worth a look if your yard's siding counts currently live only in someone's head or last month's switch list.

Start a pilot

← Back to the blog